The reconstruction of the COP-10 of Syzran.Electromagnetic compatibility
Field: Energy
2015
Dispatching accessories PSU 410Т
Field: Energy
2014
Assembly and delivery of the cells 6kV switchgear commissioning
Field: Energy
2009
Supply of control cabinets with frequency-regulated drive
Field: Energy
2010
Reconstruction of power supply system of crane
Field: Energy
2011
Delivery and installation supervision of distribution dry-type transformers kVA 1600
Field: Energy
2012
Uninterruptible power system 480кВА
Field: Energy
2013
Supply of 6 kV cells for shipyard
Field: Energy
2013
Supply cabinets with VFD
Field: Energy
2013